Scope 01Site Preparation and Grading
Regraded the site for drainage, ground stumps, cleared overgrown arborvitae, and removed ivy before installation.

Residential hardscaping and landscaping renovation
“Thomas and his team completely transformed our home. The craftsmanship is exceptional.”
Free consultation & estimate
Project Overview
SE Tropicana hardscaping rebuilt grades, concrete access, and planting zones to improve drainage, safety, and long-term outdoor usability.
Project type: Residential hardscaping and landscaping renovation
Scope Breakdown
Scope 01Regraded the site for drainage, ground stumps, cleared overgrown arborvitae, and removed ivy before installation.
Scope 02Installed aggregate concrete pads, new walkways and stairs, repaired failing paver walls, and added new paver retaining elements.
Scope 03Trimmed mature palm trees and treated stressed trees with targeted pruning and care.
Scope 04Trimmed shrubs, cut clean bed edges, installed weed barrier fabric, and placed mulch, river rock, and pea gravel.
Scope 05Installed new shrubs and plantings matched to site conditions and design goals.
Scope 06Pressure-washed concrete surfaces to restore appearance and reduce buildup.
Full Visual Record
Browse every available before and after photo from this project. Open any image for the lightbox view.
Explore More
Compare scopes, neighborhoods, and project types across our recent work.
Our Guarantee
We stand behind our work. Every H&C project includes a written one-year workmanship warranty backed by our Oregon contractor bond and insurance.
Every joint, cut, and connection we make is backed for 12 months from substantial completion. If our work fails, we fix it at no cost to you.
You receive a signed warranty document at closeout. No verbal promises. No fine-print surprises. The scope is clear before you sign off.
Report a defect in writing or by email within 30 days of discovery. We schedule an inspection, confirm the issue, and handle the repair.
Project Financing
H&C Design-Build now offers financing options through U.S. Bank Avvance. If you are evaluating a remodel, you can review pre-approval options before final scope decisions are locked.
Financing is offered through U.S. Bank

Common Questions
This project included hardscape and landscape work: grading, stump removal, concrete walkways and stairs, paver wall work, arbor care, and new planting.
The project sequenced grading and concrete work first, then wall restoration, then planting and finish materials. That sequence protected both function and final appearance.
Homeowners with aging outdoor systems who need both structural hardscape correction and design-forward landscape upgrades under one cohesive scope.
From Our Crew
Portland remodeling is what we do every day. These guides cover the real decisions homeowners face: permits, costs, materials, and trade coordination.
All guides
Portland home addition costs by type, zoning limits, permit timelines, and planning. Bump-outs, second stories, and full additions.
Read guide
Portland siding replacement costs for fiber cement, cedar, and engineered wood. What lasts in our climate, maintenance needs, and insulation tips.
Read guide
Portland heat pump installation costs by type, Oregon rebates up to $12,000, and what a contractor wants you to know. Ducted, ductless, hybrid systems.
Read guide
Step-by-step guide to applying for Oregon HOMES and HEAR energy rebates in 2026. Eligibility, income limits, stacking rules, and what to prepare.
Read guide