Portland ADU construction by H&C Design-Build

Portland ADU Construction

We deliver ADU construction with planning for zoning, utilities, and permit sequencing. This service is designed to reduce surprises by confirming feasibility and constraints before build commitments.

Thomas and his team completely transformed our home. The craftsmanship is exceptional.

Sarah & Mark J.NW Portland

Our ADU Approach

Feasibility confirmed before ground breaks.

Portland ADU projects run into zoning setbacks, utility capacity limits, and permit sequencing issues that surface after money is spent. We confirm lot coverage, system connection points, and required variances before design work starts.

You get a clear picture of what your property supports, what permits are needed, and what the realistic timeline looks like before any construction commitment.

ADU Feasibility Review
1
Stage 01

ADU Feasibility Review

We define viable ADU paths for your property and identify early constraints that affect cost and timeline.

  • 1Zoning setbacks, lot coverage, and height limits checked against current code
  • 2Utility capacity and connection points evaluated for water, sewer, and electrical
  • 3Site access, grading, and foundation options assessed before design proceeds
Permits and Technical Coordination
2
Stage 02

Permits and Technical Coordination

Required permit and utility considerations are addressed before construction mobilization.

  • 1Permit applications filed with Portland BDS in correct sequence
  • 2Utility coordination scheduled so connections align with construction phases
  • 3Any required variances or adjustments documented and submitted early
Construction and Inspection Closeout
3
Stage 03

Construction and Inspection Closeout

We manage construction phases, inspection milestones, and final turnover for occupancy readiness.

  • 1Foundation, framing, and mechanical systems built to inspection-ready standards
  • 2Trade scheduling coordinated so inspections pass without rework
  • 3Final occupancy walkthrough and utility activation completed before handoff

Our Guarantee

1-Year Craftsman Warranty

We stand behind our work. Every H&C project includes a written one-year workmanship warranty backed by our Oregon contractor bond and insurance.

Full-Year Workmanship Coverage

Every joint, cut, and connection we make is backed for 12 months from substantial completion. If our work fails, we fix it at no cost to you.

Written Warranty on Every Project

You receive a signed warranty document at closeout. No verbal promises. No fine-print surprises. The scope is clear before you sign off.

Responsive Claim Process

Report a defect in writing or by email within 30 days of discovery. We schedule an inspection, confirm the issue, and handle the repair.

What the Warranty Covers

  • Covers all workmanship performed by our crews under the original contract scope
  • Repair or replacement at our discretion for valid claims
  • Does not cover owner-supplied materials, normal wear, or unauthorized modifications
  • Manufacturer warranties on products and materials remain separate and are passed through to you
  • Oregon CCB dispute resolution available if any disagreement arises
OR CCB #251405Licensed · Bonded · Insured in Oregon

Project Financing

Finance your project without delaying the work.

H&C Design-Build now offers financing options through U.S. Bank Avvance. If you are evaluating a remodel, you can review pre-approval options before final scope decisions are locked.

  • Apply before design and permit decisions are finalized
  • Get pre-approval visibility before you commit to full scope
  • Keep kitchen, bath, structural, and exterior work on one timeline

Financing is offered through U.S. Bank

U.S. Bank Avvance financing pre-approval banner (gray version, cropped)

Common Questions

ADU Construction FAQ

01How early should I check ADU feasibility in Portland?

Check before committing to design. Zoning setbacks, lot coverage limits, and utility capacity can rule out certain ADU types or change your budget significantly.

02Do you handle ADU permitting and build execution together?

Yes. We coordinate feasibility, permits, and construction under one project path so permit conditions carry directly into the build scope.

03How long does it take to build an ADU in Portland?

Permitting takes 3 to 6 months depending on review complexity. Construction runs 4 to 8 months after permits are issued. Total timeline is typically 8 to 14 months.

04Does Portland charge SDC fees for new ADUs?

System development charges apply to new ADU construction. Portland SDC fees vary by unit size and utility connections. Current fee schedules are available through Portland Permitting and Development.

05What lot size do I need for an ADU in Portland?

Portland allows ADUs on most residential lots regardless of size. Setbacks, lot coverage, and height limits vary by zone and determine what you can build.

06Can I build a detached ADU in my backyard?

Yes, if your lot meets setback and coverage requirements. Detached ADUs also need utility connection points, site access for construction, and adequate drainage.