Portland garage to ADU conversion by H&C Design-Build

Portland Garage ADU Conversions

We convert existing garages into ADUs with detailed checks for structure, utility scope, and permit requirements. This service is focused on realistic conversion planning before construction starts.

Thomas and his team completely transformed our home. The craftsmanship is exceptional.

Sarah & Mark J.NW Portland

Our Garage Conversion Approach

Know what your garage can become.

Not every garage is a candidate for conversion. Slab condition, ceiling height, structural framing, and utility access all determine whether a conversion is practical or whether a different ADU path makes more sense.

We assess your existing structure against Portland code requirements and give you a straight answer on scope, cost drivers, and permit needs before any commitment.

Condition and Feasibility Review
1
Stage 01

Condition and Feasibility Review

We confirm whether conversion is practical based on structure, access, and code requirements.

  • 1Slab thickness, foundation condition, and ceiling height measured against code minimums
  • 2Electrical panel capacity and plumbing access evaluated for conversion scope
  • 3Setback, lot coverage, and parking requirements checked for compliance
Permit and Trade Coordination
2
Stage 02

Permit and Trade Coordination

Mechanical, electrical, plumbing, and structural scope are aligned with permit needs before build.

  • 1Structural engineering and trade plans submitted for permit review
  • 2Insulation, ventilation, and egress requirements addressed in design
  • 3Utility connection scope and inspection sequence mapped before construction
Conversion Build and Closeout
3
Stage 03

Conversion Build and Closeout

Construction proceeds in inspection-ready phases with final turnover once approvals are complete.

  • 1Framing, insulation, and mechanical rough-in inspected before finishes
  • 2Interior finishes, fixtures, and appliances installed on coordinated schedule
  • 3Final inspection and occupancy approval completed before handoff

Our Guarantee

1-Year Craftsman Warranty

We stand behind our work. Every H&C project includes a written one-year workmanship warranty backed by our Oregon contractor bond and insurance.

Full-Year Workmanship Coverage

Every joint, cut, and connection we make is backed for 12 months from substantial completion. If our work fails, we fix it at no cost to you.

Written Warranty on Every Project

You receive a signed warranty document at closeout. No verbal promises. No fine-print surprises. The scope is clear before you sign off.

Responsive Claim Process

Report a defect in writing or by email within 30 days of discovery. We schedule an inspection, confirm the issue, and handle the repair.

What the Warranty Covers

  • Covers all workmanship performed by our crews under the original contract scope
  • Repair or replacement at our discretion for valid claims
  • Does not cover owner-supplied materials, normal wear, or unauthorized modifications
  • Manufacturer warranties on products and materials remain separate and are passed through to you
  • Oregon CCB dispute resolution available if any disagreement arises
OR CCB #251405Licensed · Bonded · Insured in Oregon

Project Financing

Finance your project without delaying the work.

H&C Design-Build now offers financing options through U.S. Bank Avvance. If you are evaluating a remodel, you can review pre-approval options before final scope decisions are locked.

  • Apply before design and permit decisions are finalized
  • Get pre-approval visibility before you commit to full scope
  • Keep kitchen, bath, structural, and exterior work on one timeline

Financing is offered through U.S. Bank

U.S. Bank Avvance financing pre-approval banner (gray version, cropped)

Common Questions

Garage ADU Conversion FAQ

01Is every garage suitable for ADU conversion?

No. Slab condition, ceiling height (minimum 7 feet finished), structural framing capacity, and utility access all determine whether conversion is practical or cost-effective.

02What trades are involved in a garage ADU conversion?

Most conversions need structural, electrical, plumbing, HVAC, insulation, and finish work. The garage must meet habitable-space standards for ventilation, egress, and fire separation.

03How much does a garage ADU conversion cost in Portland?

Portland garage conversions typically range from $80,000 to $180,000 depending on structural needs, utility capacity, and finish level. Foundation and ceiling height issues increase costs significantly.

04Does converting a garage affect parking requirements?

Portland removed off-street parking requirements for ADUs in most residential zones. Check your specific zone overlay for any remaining requirements.

05How long does a garage ADU conversion take?

Permitting runs 2 to 5 months. Construction typically takes 3 to 6 months depending on structural scope. Total timeline is 6 to 10 months from feasibility to occupancy.